It has taken a while for us to complete the work on the inside of the "shed" at the Hollow...but it has been well worth the work and the wait.
The outside work was completed in the fall of 2011, but the interior work has slowly progressed over the past summer. Although I was originally opposed to painting the inside, I have to admit...it looks better painted. Kudos to Kev for convincing me to move forward.
Many thanks to all those who have contributed time, talent, and materials to this project.
